The problem
Rework is the least measured cost in construction. It is absorbed into labour hours and material wastage, and because it is never isolated, nobody can say what quality failure actually costs the project.
The same is true of safety: incidents are reported, and the leading indicators that would have predicted them — inspections carried out, permits closed, observations raised — are not.
Core workflow
Inspect, record, correct, close.
01
ITP
Inspection and test plan agreed per activity.
02
Inspection request
WIR or MIR raised from site, with checklist.
03
Consultant review
Approved, approved with comments, or rejected.
04
Non-conformance
NCR raised, root cause and corrective action assigned.
05
Correction
Rework recorded with its cost, not absorbed silently.
06
Closeout
Snag closure, quality records and handover pack.
What it covers
Quality
Inspection and test plansWIR and MIR requestsDigital checklistsNCRs and corrective actionSnagging and punch lists
HSE
Risk assessment and method statementPermit to workToolbox talks and inductionHazard, near miss and incidentSafety inspections and PPE
Reporting
Open items by disciplineFirst-time approval rateCost of reworkLeading safety indicatorsHandover quality records
Connects with
Operational outcomes
+21 pts
First-time inspection approval
−2.4%
Cost of rework against project value
0
Lost-time incidents on connected sites
100%
NCRs closed with evidence
Ranges observed on Al Jawad engagements. Targets agreed in assessment.